At Torregra we carry out blown thermal insulation in schools and educational centers throughout Catalonia, planning each intervention to minimize the impact on teaching activity.
Request a technical visitThermal insulation in Schools
A significant portion of Catalonia's public school stock suffers from climate adaptation deficits, including insufficient insulation, limited ventilation, and outdated materials.
A report by Equitat.org, prepared with the participation of the Institut Metròpoli, the UOC and the IREC, summarizes the magnitude of the problem in four facts:
01.
Temperature at which learning deteriorates noticeably.
02.
School days per year above 27 °C that are expected from 2030 onwards.
03.
Many of the public school buildings in Catalonia were built before the year 2000.
04.
Drop in academic results for each day above 26.7 °C.
*Source: Equitat.org report, with participation from Institut Metròpoli, UOC and IREC, May 2026. Data referring to the public education system of Catalonia.
The report identifies poor insulation as a problem in some school buildings and proposes a comprehensive renovation of the facilities. Improving the building envelope can reduce heat gain and loss and complement other measures such as ventilation, solar shading, and air conditioning.
Thermal insulation in Schools
Not all areas of a school have the same thermal needs. Orientation, ceiling height, and the use of each room influence its energy performance and must be assessed before considering an insulation solution.
Gymnasiums and pavilions are studied on a case-by-case basis because their construction system may differ from that of the teaching building. If a suitable air gap is not present, blown-in insulation will not be the appropriate solution.
Thermal insulation in Schools
In an educational center, we don't choose the insulation based on a single characteristic.
We review the construction system, the available space, the thermal and acoustic performance, the required fire resistance, and the building's usage conditions. The solution is defined after the technical study.
Thermal insulation in Schools
When the space and access allow, the blown-in insulation can be installed through small perforations from the most convenient access point.
The installation schedule is adapted to the center's calendar and usage to minimize disruption to students, staff, and educational activities.
01.
Ideal period to concentrate actions of greater scope, according to the center.
02.
Possibility of organizing work by building, wing, floor or zone.
03.
Suitable for certain actions when scope and access allow.
04.
We can study work in phases when safety, access and the activity of the center allow it.
Aislamiento térmico en Schools
We work with private and subsidized centers and study projects for administrations and owners of public centers.
When the scope affects the entire building or several areas, the action is planned with the same technical and planning criteria that we apply in our thermal insulation service in large buildings.
We inspect facades, roofs and accessible chambers to check the feasibility of the blowing.
We define the scope, areas of action and budget for the owner or person in charge of the center.
We agreed on phases and dates according to the school calendar, access and the operation of the building.
We carried out the blowing, sealed the access points, and checked the treated areas.
Thermal insulation in Schools
Improving the thermal insulation of a school helps maintain a more stable temperature, increase comfort in classrooms, and reduce energy consumption.
Thermal insulation in Schools
At Torregra, we adapt each intervention to the needs of the educational center, studying the building beforehand and planning the work to minimize disruption during school activities.
We studied the building envelope, checked if the insulation was feasible, and planned the scope and work schedule to minimize interference with educational activities.